Information About Electrical Installation and Wiring

Until recently the standards and regulationrequirement of Part P. The building regulations,
surrounding the electrical wiring and installation inwhich are Part P, were introduced to England and
the UK varied greatly from other EuropeanWales on 1st of January 2005.
countries. However the standards and regulationsWhen these building regulations were introduced in
in the UK no longer differ substantially from other2005 they were met with a lot of controversy
European countries.especially when it come to the rules surrounding
The current wring colours used in the UK are aswork that is carried out by non-professional
follows:o Protective Earth = Greeno Neutral =bodies such as DIY work. Under the new
Blueo Single Phase: live, three phase L1 = Brownoregulations, initiation of any work other than
Three Phase L2 = Blacko Three Phase L3 = Greysimple changes becomes notifiable to the local
When it comes to the UK electrical power circuits,building control authority. What is meant by simple
they are normally described as either radial or ring.changes are aspects such as adding extra lights
If a power circuit is radial the power isor sockets to an existing circuit. Work on a bigger
transmitted from point to point, which isscale than this should be carried out by a
conducted by a single length of cable that linksprofessional.
each point to the next. This starts at the mainWhen the new Part P regulations were brought
switch or fuse and terminates at the lastabout in 2005 the government approved several
connected device. It may branch at a connectionprofessional bodies' awards to 'competent
point. Lighting circuits are normally wired in thispersons.' This allows these 'competent persons' to
way, but it may also be used for low powerself-certify work they carry out.
socket circuits.The Building Control Authority must be informed
The ring circuit however is unknown in manyof any work that is carried out by someone not
other national wiring codes. With a ring circuit aqualified under this scheme, unless the work is
cable starts at the supply point and then goesdone in an emergency.
down to each device, the same way as in a radialAny electrical work carried out needs to be
circuit. The last device is connected back to theapproved and when it is approved you will be
supply so that the whole circuit forms agranted a certificate, a Building Regulations
continuous ring. The primary advantage is to allowCompletion Certificate.
more power to be supplied than could otherwiseIf you do have any electrical wiring or installation
be carried with a given size of cable.work that needs to be carried out on your
Going back to the standards and regulations, itproperty it is important that you hire a
should also be noted that there has beenprofessional to not only make sure that your
considerable change to the rules surroundingwork is carried out in a professional manner but
electrical installation. These changes mean that allto ensure that your electrical installation or
electrical work within a domestic setting must bere-wiring etc meets the standards set out by the
in compliance with British standards as aPart P regulations.